A part-handling and -fitting robot (left) works with the welding robots to tack pieces in place. After that, the welding robots complete the final weld.
In the early 2010s, John Bailey toured numerous structural fabricators in Europe. He was looking to automate welding, and he wanted to see some of the latest and greatest technology in action. Alas, the then president of Little Rock, Ark.-based Prospect Steel, a division of Lexicon, wasn’t impressed. The robotic cells welded just fine, but they had to be programmed. This demanded resources that, as he saw it, would hinder overall throughput.
“The technology wasn’t there yet. But then, just a few years later, we took a trip to Austria and took our 3D structural models with us.”
That was Steve Grandfield, president of the Lexicon Fabrication Group, recalling the tour company executives took in 2015. They visited Zeman Bauelemente, a robotics firm introduced to Lexicon by Peddinghaus. (Peddinghaus is Zeman’s U.S. partner. Lincoln Electric purchased Zeman in April 2021.) Lexicon wanted to take information directly from its 3D structural model (in Tekla Structures BIM software) directly into the software for Zeman’s robotic fitting and welding line.
Several factors hold many structural fabricators back from welding automation. One is the need for programming. Another is the need for processing flexibility. Lexicon Fabrication Group has achieved both and, in doing so, actually increased the number of manual welders, fitters, and assembly personnel it employs. That might seem ironic, considering that the lack of skilled labor is what drives many fabricators to robotics in the first place.
Grandfield attributed the irony to the opportunities Lexicon has gained over the past seven years. Robotics has allowed the fabricator to win work it wouldn’t have otherwise. The structural fabricator’s experience shows just how well skilled manual labor complements robotics. Automation versus manual operation isn’t a zero-sum game. Instead of one eliminating the other, they become more effective together.
Flexible Automation Flow, From Model to Weld
Someone at an OEM or custom fabricator might spend time programming a robot via a teach pendant. The process might be streamlined with offline programming and simulation, followed by a brief program touch-up with the teach pendant. But even if offline programming minimizes robot downtime, someone still needs to sit in front of a computer to program it. That can be problematic for structural fabrication, in which every beam, channel, or hollow structural section (HSS) might have different weld locations and requirements.
Similarly, robotic systems still need operators to wield components, fixture or tack them, and prep them for the robot. And unless the shop has a beam processing system that scribes layout marks, someone needs to mark up the cut beams before they flow downstream.
A shop relying solely on an overhead crane or fork truck to move material—instead of conveyors—might find flow hindered even more. The robot itself can be incredibly productive when it’s running, but too often it just sits idle, waiting for material to arrive.
Lexicon was an early adopter of automatic layout marking. Until 2016, most beams exited the company’s Peddinghaus cutting and drilling machines with marks made by the PeddiWriter system. Once the company turned to robotic welding, though, fewer components required those marks. That’s because the Steel Beam Assembler robotic system by Zeman automates not only the welding but also the fitting and assembly.
The part flow works like this. Beams emerge from the cutting, coping, and drill machines to a conveyor, which feeds all beams downstream. If those beams are destined for robotic welding, conveyors feed them directly to that system. The welding robot scans the beam to locate it and find the zero point.
The beam sits on a table that can rotate the work 360 degrees, allowing the robots to access all sides of the workpiece.
Adjacent to this, operators retrieve cut parts from upstream and place them on a table—in no particular order or orientation. They select the job on a nearby computer terminal, after which the assembly robot gets to work. The system scans the workpieces on the table, matching them with the part geometry information gleaned from the 3D model. With its magnetic gripper (one of several magnets the robot uses, depending on the part weight), the part-handling robot grasps the component and carries it to the beam, where it secures the component to the correct location. And because it references the 3D model directly, the robot needs no scribed layout mark.
Just before placing the part, the welding robot scans its intended location and makes any fit-up adjustment required, depending on the beam’s mill tolerances. The welding robot tacks the part in place and, drawing information directly from the 3D model, completes the weld. “The model in Tekla Structures has all the information the robot needs,” Grandfield said, including start and stop location, weld size, and other variables.
The entire beam sits on a rotating table. So, if the robots need to rotate the beam to access a tack or perform the final weld, the table rotates the beam to the required position. From there, the beam exits the system and is conveyed downstream.
In 2018, Lexicon added a dual system in its Blytheville, Ark., plant. That one features one assembly and fitting robot that works with two welding robots on two parallel beam lines (five robots total). The arrangement doubles output and helps balance the cycle times, especially on beams (as well as channels or rectangular or square HSS) with numerous welded components. As the fitting robot and welding robot work together to tack components on one beam, the other welding robot produces the final welds on the other beam.