Building and buying great software for metal manufacturing

scanrail/iStock/Getty Images Plus

Software is becoming ever more relevant and critical for the modern fab shop. Whether you are developing code in-house or shopping for a third-party tool, it’s important to understand what you are looking for. That can be difficult without having a deep understanding of how software is made.

Healthcare.gov represents an easily accessible case study on the risks of software design. It launched 10 years ago and immediately landed with a thud. It was so slow and glitchy that as few as 1% of interested people were able to enroll in the first week. The web design failed to deliver on the absolute basics, with poor workflows and glitchy user interfaces. To top it off, health insurance providers were provided inaccurate information by the site, making it difficult or even impossible to correctly handle enrollments.

Stress tests that should have explored expected user volume were wholly inadequate. A day before launch, it was found that the site became too slow with only 1,100 concurrent users. The expected user count was 50,000 to 60,000. If that wasn’t bad enough, the actual simultaneous user count soared to 250,000 within the first week, over 200 times the number of users that pre-release stress tests indicated the site could handle. In retrospect, one wonders why the stress tests were performed at all. Their clear failure did nothing to change the release timeline.

The project didn’t stumble for lack of budget. It was originally estimated to cost $93.7 million, a staggering sum even if the project didn’t go over budget. But the estimates were wildly incorrect. Before completion, the total cost rose to a jaw-dropping, tear-inducing $1.7 billion, almost 20 times higher than estimated.

Healthcare.gov works great in 2023, but at launch it was perhaps the most spectacular, expensive, and public software fiasco in history. While much of the complexity surrounding Healthcare.gov’s rollout was unavoidable, we can use its botched rollout to explore what makes software projects succeed or fail. Its failures might provide insight into how you might build your own in-house software team. It might also provide insight into what to look for when buying third-party software.

Proximity: Go to Gemba

In a previous article, I wrote about how Southwest Airlines fell apart during the holidays in 2022. In a nutshell, the company relied on decades-old software that made it extremely difficult to handle scheduling interruptions. Workers understood the problem, but company executives—insulated from the daily operational pain—failed for decades to invest in new infrastructure. That failure combined with a winter storm and high seasonal demand caused the entire company to grind to a halt, stranding tens of thousands of people the week of Christmas. Southwest itself estimates that the disaster ultimately will cost the company almost $1 billion. That extraordinary expense might have been avoided if the decision-makers were close enough to the operational problems to understand the urgency.

The lesson there is that good software is developed by teams with proximity. Good proximity implies two things: first, that the software team is intimately familiar with the pain that it is trying to solve; second, developers have proximity to the results produced by their software. Put another way, a team with good proximity understands the pain, and then uses its own software tool to alleviate it. If the software misses the target, or is glitchy or difficult to use, the developers should be the first ones to find out.

This is one area where the Healthcare.gov project certainly failed. Developers might have understood the problems their website was designed to solve, but the parent contractor operated out of Canada, not the United States, the country Healthcare.gov serves. Different components of the full system were also farmed out to many subcontractors, none of whom would have owned the full application. Even if developers understood the pain the software was intended to solve, the end-to-end user experience would have been firmly outside any individual software developer’s control.

One contractor, for example, handled authentication systems exclusively. If registration and authentication were slow or broken (and they were), whose fault was it? The user-experience designers? The database? The engineers handling the server infrastructure? The web application developers? Or all of them together? Every single subgroup might have been inside a different company. Figuring out the core issue, communicating it, and getting a fix into production would have been difficult even if the problem was well understood.

None of this should be surprising for a fabricator. Proximity is just another way to say, go to the gemba. In some ways, software development isn’t all that different from continuous improvement in manufacturing.

Rapid Iteration: Plan, Do, Check, Act

Imagine that you’ve been tasked with building a new manufacturing line from scratch, using new equipment, in an industry vertical that your company has never served before. You have a huge budget, so you should be able to make it work. But there is one major caveat: You only get one try to make everything perfect. From the start, you must select the equipment, the factory layout, and the number of people; what their training looks like and how they’ll be trained; and how much work-in-process and finished goods to keep on hand. After you finish planning, you’re locked in. You can’t change the design.

What a project that would be. Not only is it impossible to predict in advance the problems and inefficiencies in a new industry, but the entire design process— all in advance, without changes—flies in the face of the plan, do, check, act (PDCA) cycle that manufacturers have learned to apply continually. It wouldn’t make sense to approach manufacturing that way.