Custom sheet metal fabrication shops are using lean assembly techniques, including 5S and shadow boards, to improve efficiency in high-mix, high-precision operations. Traimak_Ivan/iStock/Getty Images Plus
Lean assembly in precision sheet metal fabrication exemplifies 5S, tool shadow boards and all. About a decade ago, during a technology tour organized by the Fabricators and Manufacturers Association, I witnessed an assembly operation comprising a half dozen assembly lanes.
By each lane were a collection of three or more shadow boards on wheels. When a kit of parts arrived in front of them (see Figure 1), they’d wheel the appropriate shadow board in place, then get to work. Some assembly lanes had two or three people, others had just one. How many people a lane had varied depending on the takt time they needed to meet. Jobs arrived with all the components assemblers needed for assembly, save for some common-use hardware items stored in bins at their workstations.
This is classic lean manufacturing applied to high-product-mix manufacturing. Thing is, this was a production operation—not a sheet metal fab shop. Could the same apply to a custom fab shop? In some cases, the answer is yes, and to make it happen, those fab shops have drawn from various improvement methods: quick-response manufacturing, lean manufacturing, the theory of constraints, among others. A common thread that made each implementation a success: a holistic approach, focusing on everything that happens between that initial order and the final shipment.
Two Manufacturing Models
Offering more services is the classic way custom fab shops grow with their largest customers. The relationship might start with piece-part manufacturing, but as trust builds over time, customers ask for more: forming, welding, powder coating, assembly. Traditionally, a shop might add an assembly area near the shipping department. This follows the classic, process-based shop layout: Assembly is another “process” and, thereby, needs another department.
The assembly process itself, though, reveals the reality of a typical fabricator product mix. The company really has two (or even more) “businesses” under one umbrella: (1) repeat, higher-quantity contract work and (2) nonrepeat or low-quantity job shop work (and even a spectrum of work in between).
A shop often specializes in one or the other, but the mix of work is still there—especially if the operation is trying to build its contract business. New orders start small. Recent KPI surveys from the Fabricators and Manufacturers Association reveal that new customer dollars usually make up just between 3% and 5% of overall revenue. The sales department attempts to grow small accounts into bigger ones, but in the meantime, those on the floor need to manage workflow for the entire product mix. That’s not easy.
This becomes painfully obvious when trying to add or expand an assembly operation. One area might be full of pallets holding kits of low-quantity jobs, while another area might have assemblers working in cells or lanes positioned next to controlled inventory locations. It’s like you have two manufacturing models in one department.
Thing is, look upstream and you find that this mix of work is wreaking havoc on flow and, hence, consuming capacity that can’t be sold to others. A laser is tied up for hours cutting a large batch of identical parts. Those large batches build work-in-process (WIP) inventory and extend lead times. Meanwhile, the laser next to it is cutting a dynamic nest full of different parts for several or even dozens of different low-quantity jobs. Organizing it all takes time, which adds more variability. Large batches keep machines running, but this creates huge piles of WIP staged before final assembly. All that WIP makes life difficult for assemblers trying to find the parts they need.
Gary Conner, a retired lean manufacturing consultant, knows the precision sheet metal business. He got his start at a sheet metal shop in the 1980s in the Pacific Northwest. At the time, he worked on a team that, even with the punch, laser, and press brake technology of the era, effectively separated some of the job shop’s “high-runner” work into separate value streams, where products flowed from punching to bending to hardware and final assembly—all in a small corner of the shop (see Figures 2 and 3).
Conner said his shop did this out of pure necessity. “We continued to punch, form, and insert hardware for 600 units in a batch,” he said, adding that it took the operation about a month to flow the entire job through the shop. “Soon, however, we were told we needed to fabricate and assemble 150 units a week and deliver 30 a day.” This would require a multitude of setups at the punch and brake. “Meanwhile, we had nearly 100 other customers to satisfy.”
FIGURE 1. This cart, staged near assembly, holds a kit of sheet metal components. Gary Conner
As Conner recalled the story, the customer demand spurred an entirely new way of thinking—one that focused less on machine uptime and more on part flow velocity. An idle, well-maintained machine that’s available to produce isn’t necessarily a concern. WIP sitting days or weeks on a rack, though, should raise the alarm. As Conner put it, “To quote Taiichi Ohno’s favorite sayings, ‘Sleeping parts make no money.’”
This thinking pushed Conner’s team to reorganize the shop floor and dedicate a cell to that high-volume product—from punching all the way through assembly. He added, however, that designing that cell took more than just arbitrarily moving machines to a specific area. To uncover the necessary resources required time studies that revealed how long it took for cross-trained operators to cut and bend a part, insert hardware, and perform final assembly.