Engineering and fabricating a one-of-a-kind bridge to span the Mississippi River

Industrial Steel Construction, Gary, Ind., fabricated the components and assemblies for a new arched bridge spanning the Mississippi River between Iowa and Illinois. It is a twin converging, true-arch, basket-handle bridge that is 98 ft. wide, 3,405 ft. long, and includes an 800-ft. arch span. Iowa DOT

The I-74 Iowa-Illinois Memorial Bridge that spanned the Mississippi River connecting Illinois and Iowa was functionally obsolete and over capacity, causing snarled traffic and a frequent need for repairs. A new bridge was badly needed.

But the replacement was not to be a duplicate, nor an ordinary bridge. Not only was the new bridge engineered to carry an increased load, be more than twice as wide as the existing bridge, and accommodate pedestrian walkways, it was designed to be a unique landmark bridge and spectacularly beautiful.

It is a true-arch, basket-handle bridge—one of the most complex bridge projects in the country. It is 98 ft. wide and 3,405 ft. long, including an 800-ft. arch span. The project required multiple steel girders and new approaches, and it had to be built on a new horizontal alignment.

The complex design proved to be complicated to fabricate. Every piece of the arch had unique dimensions.

Industrial Steel Construction’s Facility Factors In

Industrial Steel Construction (ISC), Gary, Ind., was awarded the steel fabrication of the components and assemblies for the new bridge, including the approaches. The facility is centrally located in the Great Lakes region, with direct access to intermodal transportation, rail, and Lake Michigan and the Illinois River system.

ISC’s facility is 1.6 million sq. ft. on 160 acres. Originally, the building was one of eight plants of American Bridge Fabricators, a division of U.S. Steel, founded in 1909 by J.P. Morgan and Elbert Gary.

ISC’s expansive building was advantageous because the company could fabricate and assemble the bridge under roof. The company has done assemblies as long as 950 ft. and has fabricated and assembled entire bridges under roof.

Precision With Under-Roof Control

ISC’s Executive Director Ankit Shah and Project Manager David Johnson explained why the under-roof fabrication was an advantage for this project.

The bridge’s design required a high degree of precision that is unusual for a project of its scale. “Whenever you want precision, you want the environment to be very controlled,” Shah said.

“We were able to assemble the floor system inside our 1.6 million-sq.-ft. shop from end to end, one half at a time,” Johnson said. Shop assembly that can be accomplished indoors is an advantage because overhead cranes can be used and thermal expansion and contraction that occurs when the steel members are exposed to sun, heat, rain, and snow are controlled.

ISC’s facility is 1.6 million sq. ft. on 160 acres, allowing for the entire bridge to be fabricated and assembled under roof. Industrial Steel Construction Inc.

The large indoor fabrication facility offered several benefits to the employees as well, because it protected them from the environment. The fabricator could use its more than 100 overhead cranes, with a 125-ton capacity, to move the massive, heavy arch members around. “Handling steel members of that size and weight would’ve been very difficult outdoors without those overhead cranes,” Shah said.

“Usually, plate girders are roughly 30,000 to 40,000 lbs. each. But when you talk about moving a 100-ton section through the fabrication process, only a few bridge fabricators nationally can manage that,” he added.

“We fabricated the structural steel for the whole bridge here, in Gary, which includes the approaches [plate girders] as well as the main span [true-arch, basket-handle bridge]. We were better able to meet the specification tolerances in the controlled fabrication environment of the plant under roof than we could have done outdoors,” Shah said.

A Tricky Bridge

Shah and Johnson described how the bridge’s unique design complicated fabrication.

“The approaches were plate girders that involved typical girder fabrication procedures,” Johnson said. “But the arch is a complex signature structure. It was uniquely designed; developing fabrication procedures involved a lot of planning.”

Not only is the bridge a true arch, it is a basket-handle type of arch—one of only two in the country, according to Shah. “The basket-handle true arch makes it more unique because you have complex geometry and more stringent tolerances in the fabrication process.”

The complexity stems from the fact that the two arches begin apart at the base and then converge at the keystone. Usually, arch bridges are aligned straight, with the keystone positioned in the center, so the geometry is not as complex as the I-74 bridge, Shah said. In addition, the arches taper—they are wider at the base and narrower at the top.

Each arch was constructed with 30 arched rib boxes. There were four typically shaped pieces at each level of the arches, each working its way up to the middle. However, each of them was unique in terms of length, size, and weight, Johnson said.

Fabrication Challenges

While many of the fabrication challenges were related to the complexity and size of the arch members, others were related to schedules and the need for high throughput. Each approach is constructed with more than 200 plate girders.

The company used Total Station surveyor equipment in the shop to make sure that all the geometry was aligned and matched the shop drawings and project specifications.

The fabricator devised a rolling ring concept to rotate the boxes to access all sides for welding. Industrial Steel Construction Inc.

Planning meetings were a weekly, sometimes daily event. “Each one of the arch members was handled like its own job,” Johnson said. “We had to fabricate them in sequence so that they were fabricated, assembled, and shipped when they were needed.”