Prescription for waste reduction: Lean facility layout

For many fabricators, the classic wastes of lean manufacturing are mere symptoms of an underlying disease: an inefficient shop layout. A.R.E. Mfg. scaled everything to fit onto a Lego base plate.

In his now famous “Toast” video, Bruce Hamilton describes the seven primary forms of waste as identified at Toyota during the company’s remarkable 20th-century turnaround. Transportation, inventory, motion, waiting, overproduction, overprocessing, and defects (as well as an eighth form added in recent years, underutilization of talent) comprise the most recognizable forms of waste and are certainly worthy of our efforts to eliminate, but in my humble opinion, they are more symptoms rather than the disease itself.

Performing a root cause analysis on the 350 or so companies I have worked with, I’ve found that the underlying and recurring “disease” leading to the systemic forms of waste is often rooted in one diagnosis: a poorly designed facility layout. Hamilton alluded to this by saying something like, “Why is the machine where it is (causing the material or operator to move around a great deal)? Is it because that’s where the power is, or where there was space in the building on the day the machine arrived?”

To save the few hours of time it would have taken to identify the perfect location for a new machine, companies instead elect to pay in perpetuity the ongoing cost of waste and inefficiencies for misplacing a piece of equipment. Pretty short sighted.

A second and even more chronic cause of waste is the long-held belief that similar machines should be grouped together in a departmental arrangement. Departmental layouts might allow operators to share tooling and expertise, which is a plus. But departments also can be manufacturing islands unto themselves and are usually managed by supervisors whose performance is measured on their department’s output tonnage(or some other measurement of quantity), rather than a metric encouraging the flow of materials.

Material transportation and operator motion are not the only waste symptoms resulting from a poor facility layout. Due to the less-than-ideal distance between operations, many choose to process larger lot sizes over making multiple trips between operations. Overproduction ensues, and subsequent operations then must wait for material to be moved in a “perceived” economic batch.

Think back to the Bruce Hamilton Toast video, or about your own home kitchen. Imagine the folly of buying a new microwave and forever placing it in the living room because there is more shelf space available there on the day it is delivered. Thankfully, what has been done can generally be undone, and many of the 1,500 kaizen events I’ve facilitated have focused on diagnosing and surgically reconstructing decades of misplaced equipment choices.

It would be nice if we could take a magic pill to cure our shop layout ailments. Unfortunately, there is no overnight cure. Developing the “perfect” facility layout is not rocket science—but it is a science.

The first step is to perform a product quality routing (PQR) analysis. In so many words, you need to identify what you make, how many you make, which processes you use, and in which order they are used. The PQR analysis may be sorted in a number of ways: by material type, customer, product type, product size, or (most frequently) process requirements.

The PQR analysis identifies unique and significant value streams (see Figure 1). For instance, an improvement team at A.R.E. Mfg.—a contract fabrication and machining operation based in Newberg, Ore.—identified four primary value streams: (1) lathe work; (2) mill work; (3) fabrication work, including tubing and sheet metal; and (4) shared resources like sawing, powder coating, and assembly. From this, you can develop an interrelationship diagram for each value stream showing the percentage of flow between each key operation (see Figure 2).

In many cases, when trying to identify value streams, I get pushback from company owners who say, “We are not Toyota. Everything we make is unique. We don’t have distinct value streams!” True, no one is Toyota, but when I ask them: “Imagine that you are required to move out of this building and into three or four smaller buildings, perhaps in multiple cities. How would you divide the work?” This question usually helps them realize that there really is a way to identify families of products.

FIGURE 1. This product-quantity-routing analysis shows what percentage of products flow through specific processes.

When PQR data is unavailable or difficult to obtain, you can try a technique that has proven itself many times over: the AEIOU matrix (see Figure 3). If material tends to move consistently between two processes on an hourly basis, then the relationship between those processes is A, absolutely important. If the frequency of product routings between operators is a daily rather than hourly event, then it may be E, especially important (but not absolutely critical). Weekly flow may be I, important; monthly routing events are probably O, of ordinary importance; and process relationships based on annual routings may be deemed U, unimportant. X stands for an unwanted connection. For example, welding and grinding paired with volatile chemicals or paint processes would be a bad idea.

2. Map the Value Streams