Jackie Willis, QC technician, performs in-process inspection adjacent to the fabrication cell. Images: Caster Concepts
Good quality control (QC) can be central to a fabricator’s success. If jobs don’t meet specs or the demands of downstream operations and the final customer, rework—the costliest form of waste—can skyrocket. QC is supposed to help prevent that.
QC also is a bit counterintuitive: Job-flow velocity matters. Caster Concepts, an Albion, Mich., manufacturer of heavy-duty casters and automated material handling equipment, noticed this immediately when it underwent a significant manufacturing transformation more than two decades ago. As it turns out, the better parts flowed, the easier and more effective QC got.
Back in the early 2000s, Caster Concepts was searching for ways to streamline its process and improve its lead times and on-time delivery. As a company that delivers specialized products for a range of industries, product mix was unpredictable and lot sizes were highly variable. The company had reached out to some lean manufacturing consultants but didn’t have much success. Then, the production managers got into some reading that seemed to ring true for their high-product-mix operation.
The first was Eli Goldratt’s “The Goal,” the fictional narrative that describes the finer points behind the theory of constraints (manage flow by your bottleneck). The next was “It’s About Time” by Rajan Suri, professor emeritus at the University of Wisconsin-Madison and the founder of the Center for Quick Response Manufacturing, or QRM.
As Andrew Dobbins, vice president of manufacturing, recalled, “QRM really changed how we operate the manufacturing side of the business. We had manufacturing resources, but we weren’t applying them where they were needed. We had all this historical data, and we had thought the inventory we were making was the right inventory, that we were making the right products. That wasn’t always the case. We knew we had to find a more effective manufacturing process.”
The Hidden Wastes of Large Batches
QRM resembles lean manufacturing in some ways—excessive inventory isn’t good, for instance—but unlike lean, QRM is tailored for high-product-mix operations. A key metric is manufacturing critical-path time, or MCT. In “It’s About Time,” Suri defines MCT as “the typical amount of calendar time from when a customer creates an order, through the critical path, until the first piece is delivered to the customer.” In his books, Suri dives much deeper into MCT, which, in effect, sets the stage for the manufacturing transformation.
Like lean manufacturing, QRM recognizes that jobs spend most of their time sitting between operations. The actual time where work is being done and value is being added—the laser cuts, the brake bends, the welder welds—can be a matter of minutes or hours. But alas, it still takes weeks to deliver jobs to customers. For the most part, jobs sit on the floor in various traffic jams. Creating them is that build-to-stock, keep-the-machines-running mindset everywhere in the plant.
Imagine a brake operator bending a batch of parts and placing them on a pallet. Because of all the setup time, the shop groups like jobs together and fabricates ahead when it makes sense. Customers can simply pull from finished-goods inventory, and that inventory should provide a healthy buffer against those unexpected demand spikes. At least that’s how the thinking goes.
Right after bending, parts enter QC. QC personnel had signed off on the first article, but they found that something went awry later in the run. Nearly the entire batch had to be scrapped. That’s not the end of the world, the thinking went. Forming will just run the job again, and we’ve got that finished-goods inventory buffer there for a reason.
Of course, rerunning the job sends other jobs behind as well, and overtime ensues as rework mixes with rushed jobs. The increased chaos leads to more errors, rework, and unpredictability.
(From left) James Terry, scheduling manager, and Jamie Daglow, material handler, talk about the day’s production strategy. Continual communication helps catch problems early.
So, the shop doubles down. Managers obsess over machine uptime metrics. We need to produce so we have the inventory that customers need! Managers scrutinize past demand patterns and work with customers to develop better forecasts; production ramps up to feed finished-goods inventory. Laser-focused on machine utilization, supervisors strive to minimize setups whenever they can, grouping like jobs together. Of course, downstream workstations can’t do anything with all those large batches of work, so more work-in-process (WIP) inventory goes into racks.
WIP sits for weeks or even months before the bending department is ready for them—at which point, QC personnel checks the edges and discovers a problem that could have been caught months before.
Meanwhile, everyone’s workday has turned into a quixotic scramble, and company leaders soon realize that chasing windmills hasn’t helped the shop culture, customer relationships, or the bottom line.
Why Are You Making This?
The previous narrative is generic, not company-specific, but people at Caster Concepts, a 125-employee organization, remember similar experiences. Dobbins described an improperly machined caster arriving in assembly. It came from inventory, and the company already had more than 500 of those faulty parts in stock.
Dobbins recalled an epiphany he and others at the company had more than a decade ago. “There are certain moments in life you just remember. You never forget.”